TSX: FCUOTCQX: FCUUFFSE: 2FU

Saudi Arabia pushing forward with Nuclear Energy

October 12, 2017

In my last blog post, http://www.fissionuranium.com/blog/index.php?&content_id=610 I drew attention to the Middle East’s plans for nuclear energy. For example, the UAE (United Arab Emirates) has its first reactor coming online next year , Jordan has two reactors on order and Oman is investing $120M in Berkeley Energy’s Salamanca uranium project. However, the home of Big Oil has one country whose nuclear ambitions outshine all of its neighbours: Saudi Arabia.

The Saudis currently have sixteen reactors in the proposal stage and, earlier this month, Utilities Middle East Magazine reported that the country is currently seeking international partners to push its nuclear development plans forward.

According to the article, http://www.utilities-me.com/article-5094-saudi-arabia-drums-up-support-for-nuclear-energy-ambitions/#.WdPOGK4TGEc the president of King Abdullah City for Atomic and Renewable Energy (KACARE) has held "high-level meetings with representatives of Russian, US, Japanese, and South Korean delegations" to review how they may support the kingdom's plans to implement the National Atomic Energy Project. The officials are said to have discussed feasibility studies, as well as front end engineering designs (FEED) for the construction of the country’s first two reactors.

Shortly afterwards, Rosatom announced that KACARE had signed a “Programme for Cooperation in the Peaceful Uses of Nuclear Energy” with Russia. According to a news release issued by Rosatom, http://www.rosatom.ru/en/press-centre/news/russia-and-saudi-arabia-to-develop-cooperation-on-peaceful-use-of-nuclear-energy/ the programme “provides for cooperation between Russia and Saudi Arabia in several key areas such as small and medium reactors that could be used for both power generation and water desalination, in the area of human resources and nuclear infrastructure development for the Saudi national nuclear programme.”

For me, Big Oil turning to nuclear is one of the most under-reported energy trends out there. You have these countries with huge energy reserves and low energy costs that are stepping forward to embrace nuclear power generation. Yes, they also have ambitious solar energy plans – unsurprisingly for countries that see so much sun. However, they understand that a large percentage of their energy mix has to deliver baseload power and to do that – assuming you want the baseload power to be clean – you have to include nuclear energy.

Dev Randhawa, CEO and Chairman, of Fission Uranium 

Forward-Looking Information: Some of the posted entries on the CEO Corner may contain forward-looking statements. Forward-looking statements address future events and conditions which involve inherent risks and uncertainties. Actual results could differ materially from those expressed or implied by them.  Examples of forward looking information and assumptions include future estimates of the worldwide supply and demand for uranium and the effect that these changes could have on the short term and long term price of uranium on the world markets, statements regarding the future operating or financial performance of Fission including the net present value, metal recoveries, capital costs, operating costs, production, rates of return and payback.  Forward looking statements involve known and unknown risks and uncertainties which may not prove to be accurate.  Such statements are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations.  Among those factors which could cause actual results to differ materially are the following: market conditions and other risk factors listed from time to time in our reports filed with Canadian securities regulators on SEDAR at www.sedar.com.

In some cases, forward-looking statements can be identified by terminology such as "may", "will", "should", "expect", "projects", "plans", "anticipates" and similar expressions. These statements represent management's expectations or beliefs concerning, among other things, future operations and various components thereof affecting the economic performance of Fission. Undue reliance should not be placed on these forward-looking statements which are based upon management's assumptions and are subject to known and unknown risks and uncertainties, including the business risks discussed above, which may cause actual performance and financial results in future periods to differ materially from any projections of future performance or results expressed or implied by such forward-looking statements. Accordingly, readers are cautioned that events or circumstances could cause results to differ materially from those predicted.

Links: Some of the posted entries on the CEO Corner may include links to 3rd party websites. Fission has not reviewed all websites linked to or from this Site and is not responsible for the contents of any such websites. The inclusion of any link does not imply endorsement by Fission of the linked website or its content. Use of any such linked website is at the user's own risk.



For further information we refer you to our legal notice.

X